re: Ann: Multiple targets identified from gro... Always hope...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 53,839 Posts.
    lightbulb Created with Sketch. 33
    re: Ann: Multiple targets identified from gro... Always hope with a drill in the ground with 100 holes planned at Junction. Nevada results pending. Phas 2 drilling in the Yorke Peninsula underway. Lots happening - whether we get geologically lucky is another thing altogether. Fair long shot. $7.7m cash at the end of 12/10 with 800K cash spend for the quarter ending in March. Next quarterly will be of note re- fiscals.

    Sydney - Monday - April 4: (RWE Australian Business News) -
    Marmota Energy Ltd (ASX:MEU) has completed additional ground
    electromagnetic (EM) surveys at Junction Dam in preparation for Phase 3
    drilling planned to commence shortly.
    The ground EM survey was completed over the 5km-long 'Bridget'
    prospect immediately to the north of the 'Saffron' prospect.
    Ground EM data played a significant role in drill target
    vectoring processes over Saffron, where high grades of uranium have been
    intercepted by Marmota.
    Multiple strong conductive zones have been mapped by the new EM
    survey, defining this part of the Yarramba Palaeochannel, which also
    hosts the nearby Honeymoon development.
    The EM data from the recent survey compares favourably to EM
    data previously acquired over the adjoining Saffron prospect.
    EM signatures returned from the depth of uranium mineralisation
    at the Saffron prospect are interpreted to be the same as at the Bridget
    prospect. This is considered "very encouraging" for significantly
    increasing the size of the current zone of mineralisation.
    One hundred holes are planned for Phase Three drilling,
    scheduled to commence in the first weeks of April. Twenty of the
    drillholes will be used to test targets at the Bridget prospect, with
    the remaining holes to be utilised for expansion drilling at Saffron.

    *****

    Marmota Energy is set to further increase its ownership interest
    for the uranium rights at Junction Dam.
    It has been notified by Teck and its partners that they do not
    intend to contribute to the 2011, Phase 3 drilling program.
    Following planned expenditure on the Junction Dam project in
    2011, Marmota is set to further increase its ownership interest in the
    uranium rights from the current 74.5pc interest it holds in the joint
    venture.
 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
-0.002(5.00%)
Mkt cap ! $39.11M
Open High Low Value Volume
4.0¢ 4.0¢ 3.8¢ $84.00K 2.183M

Buyers (Bids)

No. Vol. Price($)
1 3172 3.8¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 4340994 1
View Market Depth
Last trade - 15.54pm 29/11/2024 (20 minute delay) ?
MEU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.