The is the fourth drilling program for 1200m RC. Probably a 10 days drilling follow by 3-4 wks result. However, a good visual from the drill core will give a good indicatio.
If the result is consistent or better in the new zones, we are looking at a massive rerating from the current SP of 0.5/0.6.
It is an incredibly cheap entry for such a short turn around of IOCG exploration.