Share
6,058 Posts.
lightbulb Created with Sketch. 875
clock Created with Sketch.
14/02/18
14:30
Share
Originally posted by El Jefe
↑
$ in the kitty will be gone in 3 months time. That $10M hasn’t gone very far. I would have thought drilling in Africa, with local workers would have been a lot cheaper than Australia but it doesn’t seem to be the case with almost $5M planned expenditure this quarter and it being the wet season!
This company needs to sign some offtakes and create some value/hype before raising again at these prices. The cobalt space on the ASX knows nothing apart from hype.
Expand
I just want to correct this, I didn’t include the $3.6M from tranche two as it was received after the quarterly. Approx $5M left end of this quarter imo.