UMW NAGA 5 RIG ARRIVES AT
THE BARAGATAN-1 WELL LOCATION
Nido Petroleum Limited (ASX: NDO) (“Nido” or the “Company”) is pleased to announce on behalf of
the Service Contract 63 Joint Venture partners, PNOC-EC and Dragon Oil (Philippines SC 63)
Limited, that the UMW Naga 5 jack-up rig arrived at the Baragatan-1 well location on 12 May 2014
following a ten day tow from Singapore as planned.
The forward plan is to move the rig over the Baragatan-1 surface location and complete pre-loading
activities ahead of spudding the well later in the week. For further information please contact:
- Forums
- ASX - By Stock
- NDO
- Ann: Mobilisation of UMW Naga 5
Ann: Mobilisation of UMW Naga 5 , page-14
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist