So we chased the coal seam for a further 506 meters beyond the intersection with Mira 2 giving us a total of 920 meters of horizontal well bore in coal. Not long to wait until Mira 2 comes back on line after the smaller work-over rig leaves having installed production tubing and a down-hole pump – with the plan being for that entire 920 meters of horizontal well-bore in the coal seam to flow gas and water into Mira 2.
Works completed under the anticipated time-frame even though the weather conditions were against us.
Our JV partners Santos and APLNG must be delighted that we took up the reigns and are driving Mahalo forward – as not only have we ‘cracked on’ but we have also done everything within budget.
As things stand – all parties especially us shareholders couldn’t have wished for a better outcome.
- Forums
- ASX - By Stock
- Ann: Mira 6 Successfully Drilled Through Nearly 1 km of Coal
So we chased the coal seam for a further 506 meters beyond the...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add COI (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $188.3M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 31800 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 33000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 150000 | 0.315 |
2 | 220000 | 0.310 |
4 | 272421 | 0.305 |
4 | 241300 | 0.300 |
2 | 253400 | 0.295 |
Price($) | Vol. | No. |
---|---|---|
0.320 | 15876 | 2 |
0.325 | 6800 | 1 |
0.330 | 30000 | 1 |
0.335 | 237633 | 1 |
0.340 | 113513 | 2 |
Last trade - 08.47am 26/11/2024 (20 minute delay) ? |
COI (ASX) Chart |
Day chart unavailable