-
Share
8,620 Posts.
374
23/09/18
22:33
Share
"The PFs indicated a very low cost of mining compared to peers targeting a 1.5% nickel product"
A pre-feasibility study for San Jorge does not exist. Without a JORC you cannot do a pre-feasibility study.
San Jorge remains in exploration phase. Axiom has done initial drilling, they never did anything more than that
-