    I was basing my drilling estimate for timing mainly on Kiwi-1, however I now see that Kiwi-1 did not run any casing below the 1500m mark. So allowing 5-6 days for setting casing etc at about 3400m, say Friday - Tuesday/Wednesday, that makes drilling ahead into D Sand as possibly Wednesday and then maybe F Sand the following day. There is some mixed weather out in the basin presently so perhaps a little additional downtime could be adding to all this. Note at these depths, the average rate of drilling ahead is about 35m/hr.
 
watchlist Created with Sketch. Add ECH (ASX) to my watchlist
(20min delay)
Last
36.0¢
Change
-0.020(5.26%)
Mkt cap ! $87.34M
Open High Low Value Volume
36.0¢ 36.0¢ 36.0¢ $958 2.661K

Buyers (Bids)

No. Vol. Price($)
1 14290 36.5¢
 

Sellers (Offers)

Price($) Vol. No.
38.5¢ 1940 1
Last trade - 10.02am 07/11/2024 (20 minute delay) ?
ECH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.