I had a brief chat with Andrew Tunks.
He agreed that the company should have explained why the number of holes was less than initially planned. He said he was happy for me to discuss this on HC.
He said the terrain on some of the locations was rougher than initially anticipated so they decided not to drill the holes which operationally couldn't be accessed because of access, steep terrain and swampiness.
I read this in context of the announcement which says they are still going to use the existing holes for their intended purpose, and then do some more targeted drilling.
Just means more - and possibly more targeted - results to come in the future?
- Forums
- ASX - By Stock
- Ann: Maiden Drill Program Completed at Mulligan
I had a brief chat with Andrew Tunks.He agreed that the company...
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add MEI (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.2¢ |
Change
-0.003(3.16%) |
Mkt cap ! $222.2M |
Open | High | Low | Value | Volume |
9.7¢ | 9.7¢ | 9.1¢ | $312.4K | 3.347M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 18152 | 9.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.3¢ | 23280 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1773521 | 0.011 |
11 | 2924000 | 0.010 |
6 | 4510000 | 0.009 |
7 | 2258300 | 0.008 |
1 | 142857 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 620532 | 3 |
0.013 | 1998837 | 5 |
0.014 | 926384 | 7 |
0.015 | 670000 | 2 |
0.016 | 1179000 | 5 |
Last trade - 16.10pm 27/11/2024 (20 minute delay) ? |
MEI (ASX) Chart |