My biggest concern with Agrimin is their designed trench spacing which is 1km + and up to 2km in places. I’m not sure how they came up with this design but the spacing is impressive. Another concern is they are solely reliant on trenching so this lack of optionality presents a significant operational risk imo especially with the flows and low grade they are dealing with. For eg will the lower flow zones (in their range) drain over those designed distances ?
- Forums
- ASX - By Stock
- AMN
- Ann: Mackay SOP Project Update
Ann: Mackay SOP Project Update, page-12
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.010(7.41%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
13.5¢ | 14.5¢ | 13.5¢ | $4.941K | 35.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30000 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 74741 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 13.05pm 26/11/2024 (20 minute delay) ? |
AMN (ASX) Chart |