To make it a little more simple
RE the testing
If you were emptying your swimming pool with a pump . Would you stick a hose in it at the same time ?
Because that is effectively what the rain is doing
As for the depth of trenches
6 meters means more resource
So if you could dig past 4 meters why wouldn’t you ??
And a cut of grade is essential
Because ponds plant etc is going to be sized
To the grade
Eg a resource that is 10000 mg will require
Half the pond size of a resource of 5000 mg
A 2000 mg brine being pumped in will
Require
2.5 times as long evaporation as a 5000 brine
Meaning pond neads to be 2.5 times bigger
To achieve the same evap time
It also alters the mass balance
Salt ratios etc
- Forums
- ASX - By Stock
- AMN
- Ann: Mackay SOP Project Fieldwork Update
Ann: Mackay SOP Project Fieldwork Update, page-11
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
-0.005(3.45%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
14.5¢ | 14.5¢ | 14.0¢ | $9.437K | 67.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 86515 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 13510 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 12.49pm 22/11/2024 (20 minute delay) ? |
Featured News
AMN (ASX) Chart |