-
Share
23,765 Posts.
258
09/10/09
13:20
Share
re: Ann: Low Op. Costs Int. Optimisation Conf...
"Average Mining Cost Ore & Waste (contractor) $A/tonne 3.00 3.00
Concentrator Operating Cost +/�]20% $A/tonne 8.92 8.92"
Almsot made me spill my coffee IMHO almost impossible to get costs that low.
Even iron ore miners cant ship the stuff out from site under $40 a ton OPEX let alone $3.00 a ton these guys are quoting
I would be very weary of this croud
-