PT PLN has agreed to provide continuous electrical power of up to 20,000 kVA. not 20,000 kVA but UP TO 20,000kVA If my memory serves me correct the total power requirement for the 8 furnaces is around 68MW gross.
The ASX can overlook its Telecomm small-caps. Here’s one diversified brand with an international footprint