“The Phase 1 drilling program at the Kitotolo-Katamba Lithium Project, is initially designed to comprise shallow (40-60m) drilling rapidly target near surface lithium mineralisation, along strike, hosted within exposed LCT pegmatites, which was defined by the Company’s previous trenching and test pitting work.
Further deeper AC/RC drilling will follow the initial shallow drilling program, targeting depth extensions of the anticipated shallow intercepts”
3,200m already drilled!!! There’s your photo and evidence Big K, no doubt you will complain about something else now