LOL you literally said "No spod identified" when they are LITERALLY drilling into spod?, as identified in previous trenching works? My mind is baffled at how you came to your conclusion.
"“The Phase 1 drilling program at the Kitotolo-Katamba Lithium Project, is initially designed to comprise shallow (40-60m) drilling rapidly target near surface lithium mineralisation, along strike, hosted within exposed LCT pegmatites, which was defined by the Company’s previous trenching and test pitting work."
Check back in 3 months and will see who has the last laugh