Been through your numbers a few times and they make sense, in fact you have been somewhat conservative with the dimensions of the dam. To quote the announcement....
"The Kipushi tailings extend for over 1.2km in length and over 400m in width. The tailings have a maximum depth of approx. 12m in the centre of the tailings dam and 5m at the boundaries of the tailings dam, with average depths of approx. 8m."
That puts the it at 3,840,000+ cubic meters and using google maps, (11°46'25.7"S 27°15'50.9"E) site appears to confirm at least the length and width of the tailings dam.
If these figures are correct, in simplest terms the damn contains (say at 1.5%) 57600 cubic meters or 512 640 tonnes of Cobalt. (83.5% = 42805)
So we maybe looking at producing 42805 tonnes of cobalt @ 93,750USD = 40 billion worth of cobalt.
Even at 10% profit margin to go into dividends - which is incredibly conservative but takes into account all the DRC & TS taxes we will look at $4Billion USD or 5.2B in potential dividends.
At 10% profit margin of $5.75 per share dividends.... some numbers do not make sense here.
Please someone tell me where I have dropped a decimal point or something.
- Forums
- ASX - By Stock
- Ann: Kipushi Tailings Project Update
Been through your numbers a few times and they make sense, in...
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CFE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
NXD
NEXTED GROUP LIMITED
Nick Poll, Managing Director
Nick Poll
Managing Director
SPONSORED BY The Market Online