The drilling depth at St Barbara's Leonora u/g mine is something like 1.3km...so definately worth testing these large systems around the 250 to 750m mark. It is not that expensive either; a 750m diamond hole would only cost around $120,000. So three holes include mobilisation and assays etc probably $500k tops. Good risk/reward...