is this the same drill that ROC did about 14 years ago?
5.1.2 TP/15, Perth Basin, Offshore Western Australia (ROC: 20% and Operator)
One exploration well, Twin Lions-1, was drilled in this permit during the Quarter. The well commenced drilling on 1 February 2003. It was drilled as a vertical hole to
Page 9 Roc Oil Company Limited Report for the Quarter ended 31 March 2003
a total depth of 1,570 mBRT. It was plugged and abandoned as a dry hole after encountering no hydrocarbon indications in the potential reservoir section.