Recommencing BW will cost less than $5M imo. Much less probably.
Cost of trucking is included in AISC, so its not a matter of whether the trucking cost will be worth it. Its a question of whether AISC will be worth it. IMO AISC for the starter pit (which will be mostly the laterite ore, probably as low as 2:1 stripping ratio) will be WELL UNDER $1K per oz, so very much worth is.
Cdchi1
EAR Price at posting:
21.0¢ Sentiment: Buy Disclosure: Held