Further work The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling). Diagrams clearly highlighting the areas of possible extensions, The next step would be construction of a production well to obtain aquifer parameters for the sand and breccia units, and to estimate potential future production rates from a wellfield. Borehole (PNN-SU-DW-02) has been converted to a piezometer well for measuring water level during future aquifer testing of the proposed production well.including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.
- Forums
- ASX - By Stock
- PNN
- Ann: JORC Resource Restatement Pular Lithium Brine Project
Ann: JORC Resource Restatement Pular Lithium Brine Project, page-5
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add PNN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.8¢ |
Change
0.001(1.03%) |
Mkt cap ! $10.45M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 9.8¢ | $7.429K | 75.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 815322 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 68081 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 9514105 | 0.003 |
10 | 13920499 | 0.002 |
7 | 29280000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 5995377 | 9 |
0.005 | 8973777 | 9 |
0.006 | 1008000 | 1 |
0.007 | 200000 | 1 |
0.009 | 199000 | 1 |
Last trade - 15.00pm 15/11/2024 (20 minute delay) ? |
PNN (ASX) Chart |