Assays for the last 5 holes drilled at Jericho JV were not included in the 9 October report.
If encouraging, MEP will release them into the SPP period before 2 November. If excellent, the news will go off like a hand grenade. If poor, they may just want to hold release until 3 November.
Watch this space.
Ash