Share
307 Posts.
lightbulb Created with Sketch. 226
clock Created with Sketch.
21/12/18
00:16
Share
Originally posted by djm3001:
↑
But Aqua why should Axiom be awarded a PL over Kolosori when they have NO landowner support? doesnt this show that the system is working.? Because you can't progress things without landowner support and that has patently not been there for some time. The landowner group that has been with them from the start has completely broken with them. Axiom have issued demands through their lawyers for repayment of all moneys paid to the kolosori trustees between 2011 and 2016. About $4.4 million SBD. There is no way forward on this tenement after that. No way forward. What they need to do is progress San Jorge and try and salvage some value for shareholders. Perhaps a rethinking of overheads to more realistically match the reality of a small DSO operation on a 36 sq km tenement would be something to put their mind to over the break to stop the endless CR and dilution. The huge wages have always been justified because of the unique and "amazing" relationship RM has with landowners. This would seem to be somewhat exaggerated in view of the current circumstances.
Expand
Come on, pal, Axiom did and still does have the support of the majority of the Kolosori landowners. This is demonstrated by the fact that SAA was obtained and presented to the Ministry. “The rejection may not be based in law” is the result of some unscrupulous operators’ conniving act.