Ugly result , yes well done to poster Atlantic , for getting the total oz's correct .
Guess need to look at it a bit deeper , cut off grade of 0.1 gram a tonne Au suggests very low cost mining even at 1 gram a tonne Au.
Also it seems issue with the RC drilling and they would have been better off doing sonic drilling do get a result close to the higher grades reported by DD drilling sonic drilling I believe is very low cost , and also would indicate the ore would not need to be blasted for mining .
I have sold down
EXU Price at posting:
7.9¢ Sentiment: None Disclosure: Not Held