Gday WS,
My numbers are loose and hypothetical. I had been using the 113MW Bodangora numbers as a guide since its size is similar to the combined size of both Cherry Tree and Forsayth (120MW) with a small margin for reduced build costs. I also mistakenly wrote 'EOY 2018', but meant end of this year.