    There was around 13k tonnes of stockpiled ore at surprisingly around current mined grade according the the last quarterly providing that is still there ,guessing that allows for around 8 days production .
    If the LHD / bogger is on a drive which I imagine is the most likely place for it I doubt it will effect access to prodn as they can just work on other stopes at other parts of the mines . I think it unlikely the LHD would be on the decline when it broke down as would it not be spending most of its time just tracking back and forth from a stope face along a drive to a haul truck ?
    There were two plant stoppages last quarter for mill and bin liner replacements we heard nothing about, plant still achieved over 90% availability .
    At least this did not happen in a coal mine
 