Re the Power Plant
Sorry, have been meaning to post this for a while...
http://www.ewura.go.tz/wp-content/uploads/2017/01/Power-System-Master-Plan-Dec.-2016.pdf
Page 64 shows their "optimal" plan is to have the Ngaka power plant up and running by 2023, which means a start date of around 2020. So dont hold your breath for that. It means its coming, but no time soon.
There is the Sinoma & Hengya Chinese cement plant in the works though, which will need ~1m tonnes of coal a year, although I can't seem to find a more recent update on the progress of the build of the plant.
http://www.globalcement.com/news/it...inoma-and-hengya-cement-to-build-us-1bn-plant
- Forums
- ASX - By Stock
- Ann: IEC May Update
Re the Power Plant Sorry, have been meaning to post this for a...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add IEC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.536M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $1K | 1M |
IEC (ASX) Chart |