re: Ann: High grade shallow gold assays at Tu...
that's a hard one but there could be a bit. might be 1.5-2g/t as there a quite a few very high grade hits in the mix(if the primary miniralization is included with the laterite), fair bit of area between the two old pits. + decent width/depth, have to look at all the old hits in the ann when they first got the project. 300,000oz don't know, maybe not that much, will require a bit of thought to figure out a rough tonnage. shallow and easy to mine, might even to be just able to sell the ore to one of the close mills if they need tonnage.
this new high grade intercept looks very promising, hope they follow it up soon. think there is a fair bit of ground to the west/sw of the new hit that hasn't ever been drilled especially at any depth. this new hit(i'm assuming it's primary mineralization due to grade) is probably feeding the open ended latrite heading off to the west in the figure in the ann. exciting little gold project imo.
POZ Price at posting:
6.8¢ Sentiment: Buy Disclosure: Held