Originally posted by HotRods65
Originally posted by zero2a$mill
We all know how much gold needs to be produced per day, to break even.
Will take an ann that each tonne of dirt is producing an ounce of gold,
to get the S.P. moving.
Too many costs for such minimal throughput.
A miner in the bush can process more dirt per day,
on his own, using a dry blower, than 20 plus people
can at AUL with all their miners and gravity plant.
Bloody hell he'd be busy, 85t is a lot of dirt.
"
Bloody hell he'd be busy, 85t is a lot of dirt.
"
Joking or serious?
85t is only 134 wheelbarrow loads.
Dry blow miners use front end loaders/back hoes.
Even a bobcat can move over 1 tonne per bucket full.
Buckets are generally over a cubic metre, but even at 1 cubic metre,
that's only 35 buckets (per day), for 85tpd.