AUL 7.25% 32.0¢ austar gold limited

Ann: High Grade Results Continuing at Rose of Denmark Gold Mine, page-84

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 52 Posts.
    lightbulb Created with Sketch. 2
    I may not be the sharpest tool in the shed but did you just simplify an equation and balls it up?
    "1 tonne is usually 1 bucket of a loader?"
    "1 bucket generally 1 cubic meter?"
    so we have 85t and you come up with 35 buckets?
    to also add, it takes approx 10 wheel barrow loads to make 1 cubic meter or "1 bucket/1 tonne" and you have 134 wheel barrow loads? I would guess more around 850 (@100ltrs/kgs each barrow) to get 85t? unless you have an impressive wheel barrow and are a big unit of course?
    but hey as stated i'm not real clever and could be totally wrong? if so I'll just look stupid and walk away
 
watchlist Created with Sketch. Add AUL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.