We all know how much gold needs to be produced per day, to break even.
Will take an ann that each tonne of dirt is producing an ounce of gold,
to get the S.P. moving.
Too many costs for such minimal throughput.
A miner in the bush can process more dirt per day,
on his own, using a dry blower, than 20 plus people
can at AUL with all their miners and gravity plant.