AZS 2.27% 32.3¢ azure minerals limited

Ann: High Grade Results Continue at Oposura, page-50

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,246 Posts.
    lightbulb Created with Sketch. 88
    Are you only capable of writing posts and not reading them ?????
    This copied from a previous response to one of your posts :

    Remember that 125 tonne/day mill you thought could be made for $35 mill ???
    I calculate @ A$4000 /t Zn and 10% Zn ore that would generate revenue of less than $20 mill a year and maybe a profit of $2-3 mill at most and pay back the (supposed) cap ex in 10-15 years.

    Just too small and a reasonable sized mill is going to cost a LOT more .
    But even on the $35mill that involves doubling the mkt cap because believe me this will never get debt financed .

    Now San Felipe was preliminary anyway AND very dated !
    Did you choose not to read this or just to ignore ?
    125t/d mill is A JOKE and does nothing for your credibility if you're suggesting it would suit AZS for Osp ..If the mill doesn't suit you can't use the price !


    Falsehoods and misleading statements abound in your posts but doubt you'll find any in mine because I either stick to facts or express opinions .
    Unlike you I DO NOT express opinions as inescapable facts .


    The figures I've quoted above are facts or inferences flowing directly from them and I challenge you to fault them !!!! Do your own sums and tell me where I'm wrong !
    Prety simple 10/100 x 365 x 125 x 4000 =18.25 mill


    I've assumed Zn metal rather than concentrate produced and the actual revenue was inflated a bit over the $18 mill I calculated to be generous .

    I put them to you before ...going to read them this time ??

    PS CAPEX involves site works ,(tailings dam etc) , infrastructure (internal roads , cabling etc), mining fleet , etc as well as mill !
    Salpetie thought perhaps $40-100 mill all up for Osp
    Mid point $60 mill
    Generally you get what you pay for ...ie bigger mill , bigger cost .
 
watchlist Created with Sketch. Add AZS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.