Since the majority of holes reported so far have 2+m intersections of >=8% Zn+Pb combined I have chosen to highlight holes which have lesser thickness and or grade.
Only Hole 21 seems to have not intersected mineralisation.
The NW-SE faulting may be very important. The "NE block" is currently IMO the best section drilled to date both in density, thickness and grade. View attachment 927548
Depending on the average thickness and SG in the "NE block" back of the envelope tonnage calculations could range from 200-800,000 tons at ???10+-% combined Zn+Pb.
With a ?conservative estimates of 5m average thickness and SG of 3 there is some 200 Kt potential. If these are conservative then tonnage could increase.