Nice ann...some fabulous hits there...especially McNallys.
0.78m @ 150 gT
1.10m @ 171 gT
1.05m @ 169 gT
Noting location of those drill holes...they seem to be in a 20+ sqm area with it still open to the North and South.
Understanding that widths in these type of structure can vary significantly...but if those grades can continue over similar widths between these 3 drill holes...not including any others that are drilled...
...and applying Krum's 2.5 uplift...
...we could be looking at a reasonable tonnage from McNally's with head grade circa 300 - 500 gT...
...what do you think about chasing those narrow veins in the MS uppers now Krum? ;o)
Only kidding mate...we all agree the uppers are not for the long term outcome for AUL...but promising you'd have to agree...cheers K