Plough, mate grizzlys are standard installation for all process plants to remove oversize. I clearly stated in my post an ore sorter is $2mill (brand new 2m wide 4 sensor 40t/hr Steinert) but one could be acquired with a dual sensor 1m wise for under $1m. You would not need float for this deposit as it’s coarse visible. It’s the right plant, they just need to scalp out most of the dyke rock first. They would need a small conveyor diversion just before the VSI. I won’t get into how WMC did it in the 60s or the old timers 100yrs ago.
AUL Price at posting:
0.4¢ Sentiment: Buy Disclosure: Not Held