The 2600m of planned 4000m drilling has been completed in 2018 and now extended to 6000m drilling program.
Drilling has now re-commenced.
"... based on the highly encouraging results to date, the program has now been extended to test the remaining margins of the Langi Logan basalt dome for up to 6kms further south where no previous drilling has occurred – for a total of up to 6,000m of AC drilling."
"The program has delivered Navarre’s highest-grade AC drill intercept to date from its extensive drilling campaigns within the Stawell Gold Corridor and has intersected significant zones of high-grade gold mineralisation, with individual assays up to 15.8 g/t gold within a broader zone of 33m @ 2.9 g/t Au from 66m to end of hole in drill hole LLA014."
The best part is that the mineralisation is open at depth.
NML Price at posting:
5.7¢ Sentiment: Hold Disclosure: Held