Many of those issues were addressed within the JORC statement
The Mineral Resource estimate has the following cut-offs applied; 160cm.g/t for underground Mineral Resources, 0.5g/t Au (within open-pit shells) for the open-pit Mineral Resources, 0.35g/t for Theta Hill due to the mining method and 0.35g/t Au for tailings Mineral Resources.The geological loss factors are, 10% for other Inferred areas and 5% for Measured and Indicated Mineral Resources. An additional 5% density factor was applied to the newly drilled area of Theta Hill due to the uncertainty of the density because of the friable ground conditions encountered in the drilling.These resource contain a mix of open-cut and underground gold deposits, with deposit style varying from near-surface, flat lying reefs to sub-vertical, quartz-reef hosted deposits such as Rietfontei.........................
- Forums
- ASX - By Stock
- Ann: High Grade Gold Assays at Theta Hill
Many of those issues were addressed within the JORC statementThe...
Add TGM (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $117.4M |
Open | High | Low | Value | Volume |
18.0¢ | 18.0¢ | 17.0¢ | $9.403K | 53.96K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15000 | 17.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 219320 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 84459 | 0.130 |
2 | 28800 | 0.125 |
1 | 20000 | 0.115 |
1 | 7888 | 0.110 |
3 | 168005 | 0.100 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 30923 | 1 |
0.145 | 7000 | 1 |
0.150 | 20000 | 1 |
0.155 | 20000 | 1 |
0.160 | 178562 | 4 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
TGM (ASX) Chart |