-
Share
5,127 Posts.
367
26/06/18
15:12
Share
Hey mate,
Any idea at what point we are expecting the FEED for stage 1 to be completed? Unsure how long these things take, says at some point in Q3 as below:
"Complete the FEED program for Stage 1 development and construction (due Q3 2018), concurrent with evaluating development and funding solutions"
If done concurrently with evaluating funding, I assume that could be a big catalyst for either funding being finalised or takeover.
-