Ive done some quick calcs.. for the general totalled up averaged intercepts on both cobalt and copper.. if they extend for like the general 500 x 500m area which looks plausable.. then it should be an exploration target of about 150k tonnes cobalt equivalent for the kamilombe ntheastern quarter.. which should be the minimum...
They would need to drill out about 32 holes at 100m spacings with good core recovery.. not too difficult.. considering theyve successfully done 13 drills over both tenements recently...
They then leave the stheastern quarter for later.. once theyre in production...
- Forums
- ASX - By Stock
- TAR
- Ann: High Grade Cobalt Mineralisation Potential Confirmed
Ann: High Grade Cobalt Mineralisation Potential Confirmed, page-20
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.648M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4134848 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 249009 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2601223 | 0.008 |
13 | 3205738 | 0.007 |
11 | 1655817 | 0.006 |
4 | 3917980 | 0.005 |
6 | 3676292 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 883175 | 1 |
0.010 | 422125 | 4 |
0.011 | 309002 | 1 |
0.012 | 492825 | 1 |
0.013 | 795743 | 1 |
Last trade - 16.12pm 29/11/2024 (20 minute delay) ? |
Featured News
TAR (ASX) Chart |
Day chart unavailable
The Watchlist
NXD
NEXTED GROUP LIMITED
Nick Poll, Managing Director
Nick Poll
Managing Director
SPONSORED BY The Market Online