Yes I though we did have someone. Wasn't it Doctorwho2 ? Below is her previous posting on HC.
And yes the 70 degree celsius for heat leaching is very good. Quite low! And easily achievable with by product steam/heat from Acid production.
It just keeps looking better and better this project. The numbers are really starting to come together showing a potentially outstanding mine and investment.
Below is an explanation on Acid from Doctorwho2. [Doc care to get on board and comment?]
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
posted by Doctorwho2 on 22/12/2018
[Looking briefly at costs. The cost of Sulfur (from China) is US$250 to 350 per tonne. The cost of Sulphuric Acid is US$200 to $350 tonne; in each case freight is excluded. The atomic weight of sulphur is 32, the atomic weight of sulphuric acid is 100. Oxygen and water are $ free. So 32 tonnes of sulphur will make 100 tonnes of sulphuric acid. So for every 100 tonnes of sulphuric acid produced on site from sulphur there will be a saving of US$12000 to $23000 plus savings in freight and the value of the energy produced from burning sulphur, less the proportionate amortization and maintenance costs of the plant. The Hall's creek mobile belt contains bands of sulphide bearing shales and YAK has pointed out such material is already stockpiled at the nearby Argyle mine, so there may be cost savings to be had by getting sulphur (as iron sulphide) from such materials, rather than importing sulphur. Looks like KRR have an interesting set of calculations to do. But a straight forward numbers game.]
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Not sure the Doc was aware we had a Flurospar project as well. Some in the threads or announcements is a quote that Fluro acid can be used as a substitute in acid leaching. Will try to find it.
Yak52.
- Forums
- ASX - By Stock
- KRR
- Ann: Heated vat leach of run-of-mine material
Ann: Heated vat leach of run-of-mine material, page-18
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add KRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(8.33%) |
Mkt cap ! $13.75M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.2¢ | $25.89K | 2.058M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 751776 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 1626880 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 6200311 | 0.009 |
8 | 28480304 | 0.008 |
5 | 5799516 | 0.007 |
6 | 5100808 | 0.006 |
12 | 8038888 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 1100000 | 2 |
0.011 | 2390000 | 4 |
0.012 | 1242985 | 7 |
0.013 | 1846567 | 8 |
0.014 | 972413 | 7 |
Last trade - 16.10pm 27/11/2024 (20 minute delay) ? |
KRR (ASX) Chart |