The decision to mine requires the processing of 50,000 tonnes to see if it is viable [ Ti ]. To do that means you virtually have to begin mining. Even if they truck the ore from Emmaville to Granville to be processed they will still have mine preparations, roads to build, crushing, separation the same as granville east mine which is annually only 40,000 tonnes. If they don't do that then it's the full set up of the processing plant, tailings dam, water storage dam and so on.
ANW Price at posting:
1.5¢ Sentiment: Buy Disclosure: Held