Pb
I have not spent time thinking about the tunnelling adventure, other than to regard it as another capability added to the quiver, and another selling reference. A net outcome between a loss of $8m and a profit of $19m is one thing, but I imagine the total profit is the difference between the total costs and the total revenue. That raises the question of how much work performed by NWH was allowed to be billed to the JV in the same manner as any subcontractor would have been entitled to bill the JV?
I have no feel for the answer.
- Forums
- ASX - By Stock
- Ann: Half Year Results
Pb I have not spent time thinking about the tunnelling...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWH (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.92 |
Change
0.010(0.26%) |
Mkt cap ! $1.574B |
Open | High | Low | Value | Volume |
$3.97 | $3.97 | $3.86 | $4.473M | 1.141M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 11521 | $3.91 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.93 | 14574 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5058 | 2.370 |
4 | 18795 | 2.360 |
4 | 37687 | 2.350 |
1 | 7879 | 2.340 |
3 | 24992 | 2.330 |
Price($) | Vol. | No. |
---|---|---|
2.390 | 11634 | 3 |
2.400 | 71958 | 7 |
2.410 | 16085 | 2 |
2.420 | 19941 | 3 |
2.460 | 816 | 1 |
Last trade - 16.10pm 21/11/2024 (20 minute delay) ? |
Featured News
NWH (ASX) Chart |