“the assay results have been received with 50 of the 51 samples returning lithium mineralisation, confirming the mineralisation at Kanuka has a strong Lithium-Cesium- Tantalum (LCT) pegmatite) affinity.
Subsequent to 30 June 2018, Force has completed its maiden RC drilling program at the Project which consisted of approximately 3,000 metres of drilling. As at the date of this report, the results of the RC drilling are pending.”
I thought I’d highlight some key points about Kanuka since no one knows how to read properly anymore. Remember all those people that came to tell us how there’s no pegmatite ?? LOL.
Hopefully the lab doesn’t take too long with the results.