I think you need to look deeper than a real basic level here. The hydraulic lift option has too much risk and probably wouldn't be able to produce enough ore. Ventilation and technical issues at 2000m below surface are major impediments.
What is the plan beyond 2021 and at what cost could gold be produced?
I worked with someone who was a specialist in slurry pumping about 3 years ago who said Gwalia had been investigating pumping from the underground for quite some time.
Well at the very least I guess you could say there is a lot of technical uncertainty in how they will achieve their plan. My first impression reading the announcement was that long term options were all on the table again. Basically it's back to the drawing board.
- Forums
- ASX - By Stock
- Ann: Gwalia Mass Extraction Feasibility Study, Guidance & webcast
I think you need to look deeper than a real basic level here....
-
- There are more pages in this discussion • 124 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SBM (ASX) to my watchlist
(20min delay)
|
|||||
Last
34.5¢ |
Change
-0.005(1.43%) |
Mkt cap ! $233.2M |
Open | High | Low | Value | Volume |
35.0¢ | 35.5¢ | 34.3¢ | $1.264M | 3.627M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 194355 | 34.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 70040 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 32500 | 3.430 |
9 | 72187 | 3.420 |
11 | 203897 | 3.410 |
9 | 117260 | 3.400 |
11 | 118353 | 3.390 |
Price($) | Vol. | No. |
---|---|---|
3.440 | 192470 | 22 |
3.450 | 143302 | 12 |
3.460 | 61139 | 4 |
3.470 | 41621 | 7 |
3.480 | 81907 | 5 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
Featured News
SBM (ASX) Chart |