Yeah Woltage, this makes sense to me.... And also confirms my suspicion in my previous post that in any other location they would be force into the HV classification. Thus into a cheaper power tarif which may have been taken into consideration in the contract. (Assumptions again like all the talk of power costs here)
Also thanks for that document Bananabender56, will look through that tonight. Dont speak Indonesian, so google translate will have to help me. Will get back to you with what i find. Im not saying you are wrong, but what you are stating doesnt sit with me. Voltage classification (V) differs from the Power (VA). While both are important the power shouldn't voltage classification. You could help me out a load by telling me the clause and table you used to form your conclusion?
Finally GMC Hotcopper used what its designed for, sharing information!!!
GMC Price at posting:
1.2¢ Sentiment: Hold Disclosure: Held