re: Ann: VPE: Growler Oil Field Reserves 3P E... Hi Gs
I agree that G1 is drilled outside of the channel sand as defined by the 3D, but how about G2 that is within the channel sand interpret from 3D?
It might be the case that G2 suffered reservoir damage whilst drilling as seen by the increased flow rate (20%) from initial testing to long term production. May be a case of a work over required to see if production at G2 could be increase or some comparison of the reservoir at G2 versus G3, 4 and 5.
- Forums
- ASX - By Stock
- Ann: Growler Oil Field Reserves 3P Estimate, PRL
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)