So just to be clear we are talking about this hole right here??
It should not be possible to have negative gold, you can only have low gold content, lets see what the numbers say.
So should be about 132kg of material created per diamond hole drilled.
So 20m x 132kg = 2.6 tons of material x 1.63g/t that contains 4.2 grams of gold.
The two sections are 4m x 132 = 0.52 tons of material x 6.19 g/t and 2.8g/t contains 3.2 and 1.4 grams of gold.
So the 20m section contains 4.2 grams of gold and the two separate 4m sections contain 4.6 grams of gold total.
So the guy is right those numbers on that graphic are wrong, it happens I have seen it before.
- Forums
- ASX - By Stock
- Ann: Greenfields Gold Discovery at Yandal West Project
So just to be clear we are talking about this hole right here??...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add GTE (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.35M |
Open | High | Low | Value | Volume |
2.8¢ | 2.9¢ | 2.8¢ | $13.07K | 465.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 186243 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 19948 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 3055535 | 0.004 |
22 | 13685797 | 0.003 |
6 | 5650000 | 0.002 |
9 | 8500499 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1660000 | 4 |
0.006 | 1000000 | 1 |
0.007 | 502750 | 2 |
0.008 | 750000 | 1 |
0.009 | 708333 | 2 |
Last trade - 15.57pm 15/11/2024 (20 minute delay) ? |
GTE (ASX) Chart |