G'day Towie. We also have to remember that ML100030, the current project, is only 10% of the overall Agate Creek tenement and less than 25% of the other 90% has been covered with testing and has defined "numerous high priority regional targets. They literally haven't even scratched the surface and the current JORC for Sherwood and Sherwood West, and the "high grade" areas must surely be up for review after those results from the 51 holes!! It's just a work in progress and if people want to wait and watch it develop, I can see them having some fun and possibly make a quid, but, apart from the highly anticipated catalyst from the granting of the ML (hijacked by management's pathetic naivety and possibly lost) there's not too many on the horizon to stir the emotions, maybe, the commencement of mining.
LNY Price at posting:
0.6¢ Sentiment: Hold Disclosure: Held