Alway a risk with restarting an old plant, I was concerned when erl said they were sending here. Safety regulation change and engineers don't keep up with them. No doubt stupid things like machine guards, signs, chemical storage, electrical isolation points, trip wires on conveyors etc. I expect that there will have been some equipment upgrades and possibly a new control system so this will also need to be commossioned and tweaked. In my vast experience with starting up processing plants if they haven trial ran yet we are still a couple weeks away from seeing any gold and if they are using our ore then our initial recoveries could go straight out to the tailings ponds. I hope burbanks are using some other ore to prove up the plant first. Not trying to be negative but what another cmplete balls up unfolding. If the plant has processing problems we are stuck with 15000t of mined ore sitting idle. I would not be surprised to see gold from Lakewood first.
- Forums
- ASX - By Stock
- Ann: Gold Ore Trucked to Second WA Mill
Alway a risk with restarting an old plant, I was concerned when...
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ERL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.935M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 9564791 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 1556666 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 213962 | 0.009 |
2 | 205000 | 0.008 |
2 | 300000 | 0.007 |
2 | 242999 | 0.006 |
1 | 1000000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 873799 | 4 |
0.011 | 1121325 | 2 |
0.012 | 1374562 | 2 |
0.013 | 163000 | 1 |
0.015 | 40000 | 1 |
Last trade - 16.12pm 18/11/2024 (20 minute delay) ? |
Featured News
ERL (ASX) Chart |
Day chart unavailable