Read the last announcement. They are allowed to do RC drilling along existing ground disturbances (existing tracks). The company will be drilling 1000m-1500m of RC drilling at Tres Estados and Ema in the week beginning 21 August 2017. An environmental permit is still being sought for a planned program of diamond drilling at Tres Estados, that might happen in late September, should the permit be granted as expected in early to mid September. Esh
BBX Price at posting:
20.0¢ Sentiment: None Disclosure: Held