-
Share
4,791 Posts.
385
18/08/17
15:10
Share
360g/t is a hell of a lot. Look at the widths of the intersections from Craters drilling : 1-2m wide
The BBX bulk samples are taken over broad areas hundreds of metres wide.
A pit the size of an Olympic size swimming pool dug to ~27m gives us our 100,000 tonnes from our two planned trial mining pits.
At 12 ounces per tonne that is $1.8 billion dollars worth of gold.
The BBX MC is $68M. Do the maths.
-