G1A 0.00% 5.9¢ galena mining limited

Ann: Galena Updates Resource, Reserve & Mining Inventory, page-22

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,230 Posts.
    lightbulb Created with Sketch. 1552
    “However that is all factored in the mining cost per tonne , which is used to work out cut off grade”

    Exactly, which imo is why it a little unfair to do a comparison to a Gold cut off grade. The two are fundamentally different. The best way obviously is to compare a producing mine of similar geological occurrence and break down the operating expenditure/AISC from there.

    In regards to % ore.. I’m talking about energy requirement.. if I was to over simplify an example I could ask;
    Which material process is going to use less energy to extract to 75% purity?.. a process with a 2.4g/t input.. or a process with a 50kg/t input.
    One is obviously much easier than the other in terms of energy required and therefore time/cost

    I think we understand each other anyway, TY for making me think btw. I didn’t know they used to do comparisons to gold equivalent, always learn something new from you Goldbugs
 
watchlist Created with Sketch. Add G1A (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.